Lean Process Improvement in the Emergency Department - 19/07/20



Résumé |
Lean engineering is based on a process improvement strategy originally developed at Toyota and has been used in many different industries to maximize efficiency by minimizing waste. Lean improvement projects are frequently instituted in emergency departments in an effort to improve processes and thereby improve patient care. Such projects have been undertaken with success in many emergency departments in order to improve metrics such as door-to-provider time, left without being seen rate, and patient length of stay. By reducing waste in the system, Lean processes aim to maximize efficiency and minimize delay and redundancy to the extent possible.
Le texte complet de cet article est disponible en PDF.Keywords : Lean, Process improvement, Patient flow, Emergency department operations, Six sigma
Plan
Bienvenue sur EM-consulte, la référence des professionnels de santé.
L’accès au texte intégral de cet article nécessite un abonnement.
Déjà abonné à cette revue ?